Installing
the Gard Receiver on a Hyundai Motor Coach by drilling four
holes.
Sliding
the Gard onto the Receiver channel.
Installing
the Gard on the Reciever using a phnematic wrench and two
bolts. Bolting the Gard onto the Receiver channel.
The GARD
installed on a Tour Coach.
While a bus
in operating on a level surface with full air up, the GARD should
ride 4" to 5" off the ground, with 4 1/2" being the
optimum height. This may be maintained with use of the leveling
valve. It should also be in-board of the tire tread edge curbside
1-1 1/2".
When the bus
is loading or off-loading passengers at the curb of a crowned road,
the sway of the bus to the right should then close the gap to 1
1/2" to 3" affording maximum protection in front of the
rear wheels during and immediately after the loading/off-loading
process.